This content requires the base game Train Simulator 2019 on Steam in order to play.
## About This Content
Churchward authorised the first toplight build in 1905, from 1907 they were
built in large numbers. These two sets (57ft and 70ft) represent the earlier
toplights with full panelling in the 1922 livery. The 57ft stock was used all
over the GW system, while the 70ft stock (built to the extremes of the loading
gauge) were used on services mainly starting from Paddington.
The GWR Churchward Panelled Toplights Pack 02 for TS Marketplace includes the
following coach types:
* Dia C29 Full Third (Bars 1)
* Dia C29 Full Third (Bars 2)
* Dia D51 Brake Third (Left Hand)
* Dia D51 Brake Third (Right Hand)
* Dia E93 Composite (Left Hand)
* Dia E93 Composite (Right Hand)
* Dia M11 TPO Stowage Car / Full Brake
Minimum System Requirements | ||
CPU | Processor: 2.8 GHz Core 2 Duo (3.2 GHz Core 2 Duo recommended), AMD Athlon MP (multiprocessor variant or comparable processors) | |
RAM | 4 GB RAM | |
OS | Windows® 7 / 8.1 | |
Graphics Card | Laptop versions of these chipsets may work but are not supported. Updates to your video and sound card drivers may be required | |
Direct X | 9.0c | |
SOUND CARD | Direct X 9.0c compatible | |
HDD Space | 40 GB HD space |